Case Studies

Manufacturing Derek Whitbeck Manufacturing Derek Whitbeck

Dual Bridge Workstation Crane: Increase Safety, Reduce Costs & Manpower

Since their establishment in 1999, Tops Solid Surface serves customers ranging from builders and contractors to homeowners and RV owners. Offering the area’s most impressive selection of quarts, marble, stone, and more for kitchen, bath, and home projects. Tops uses robotic fabrication equipment allowing them to process, cut, and finish their materials with precision and accuracy. The ideal solution for Tops Solid Surfaces was a bridge workstation crane. Initially designed with a single bridge; the revision to a dual bridge was soon after made to better support growth plans and productivity improvements.

Read More